Search
We plan to come with a manufacturing plant near Mumbai.
Everest Engineering Equipment Pvt Ltd. (EEE) was founded with the sole aim of providing high-quality machinery that can boost the country’s growth in the construction sector. “During Excon, we have launched two new products – the passenger hoist and the CNC highspeed Rebar processing machine,” said PV Ramdev, Managing Director of Everest Engineering Equipment.
High-Speed Rebar Processing from Everest
Since the Indian infrastructure and construction industry are taking a new pace, every contractor is searching for new options to speed up the projects.
APL Apollo receives design patents for six innovative products
Structural steel tube manufacturer APL Apollo Tubes has recently received six registrations for its innovative products by the Office of the Controller General of Patents, Designs, and Trademarks.
APL Apollo receives design patents for six innovative products
The overall portfolio for APL Apollo Tubes has grown to 16 with the registrations
L&T awarded contracts for its various biz
The construction arm of L&T has secured orders from prestigious clients for its various businesses.
L&T awarded contracts for its various biz
The Water & Effluent Treatment business of L&T Construction has bagged an order from Bangalore Water Supply & Sewerage Board (BWSSB) to Design, Build & Operate Sewage Treatment Plants & Intermediate Sewage Pumping Stations along with construction of main sewers for 110 villages in the Mahadevpura & Bommanahalli region
CRUSHING BARRIERS
Fragmented aggregate mining, as well as issues related to regulations and liquidity, are threatening the growth of the crushing and screening equipment segment in India.
Trenchless Technology Selection for New Utility Installation
Trenchless technology broadly refers to host of technologies used in underground pipe laying with an additional requirement of minimal ?excavation? foot prints. These technologies were initially invented to lay pipelines across river and other natural obstructions, graduating to crossing railway lines
Touching The Next Level
The demand for concrete equipment and ready mix concrete (RMC) is charting an upward trend on the back of momentum in infrastructure development and to a lesser extent, real estate.
196-m RCC Dam in 196 days196-m RCC Dam in 196 days
The complexity of infrastructure projects is increasing day by day. At the same time, the speed at which you build any infrastructure project is becoming critical. Various technological and methodological improvements have enabled us to optimise the speed and efficiency of the construction process.
Batching solutions
The recent Budget has brought back smiles to many stakeholders of various verticals; however, the key seems to be implementation on the ground level. On a positive note, VG Sakthikumar, Wholetime Director - Operations, Schwing Stetter India, says, ?Definitely there is a positive movement.